1. After the shutdown, the material in the Stabilized Soil Mixing Station is cleaned up, and the material in the final silo is released. The cement tank valve is closed and the powder in the two spirals of the cement is turned empty. In order to avoid long-term downtime, the gamble is spiral.
2. Tighten the Stabilized Soil Mixing Station blades to refuel each bearing. Remove the adhesive from the belt idler and clean the material that the belt has scattered to the floor.
3, rainy weather should pay attention to whether there is water around the control cabinet, it is necessary to promptly remove the water around the electrical control cabinet and the water around the equipment.
4. In the rainy days, the motor reducer air compressor vibrator should be covered to prevent rain.
5. The whole machine is usually painted once a year, and the whole machine oil is usually replaced once a year. The reducer is usually replaced once every six months.
6, often check each belt roller, there is no smooth rotation to repair the oil. Refer to the equipment manual for the lubrication time and the type of fuel to be applied.
7. It is strictly forbidden to add gear oil to the drum motor when changing oil. Because the gear oil will corrode the motor enameled wire. Generally add No. 46 mechanical oil. Or ordinary bulk motor oil. Diesel oil or transformer oil is also available. Generally such oils are relatively thin. Good insulation performance. Good heat dissipation.