CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-15376502861
  • Email:inquiry@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Industry Info  /  What To Pay Attention To When Cleaning Medium Concrete Mixers

What To Pay Attention To When Cleaning Medium Concrete Mixers

Date:2019-12-19     Label:

Medium Concrete Mixers

Cleaning Medium Concrete Mixers

Concrete Mixers

With the development in recent years, the construction of new countryside, the transformation of old cities and other aspects, the construction of roads, bridges, houses, etc. is booming. Concrete is the most important material in engineering construction. Ideal mixing equipment for construction sites. Compared to bridge cranes and cranes, the maintenance of medium-sized concrete mixers is relatively easy, but it should not be underestimated. Perhaps a small detail will directly affect the use of concrete mixers, such as cleaning of medium-sized concrete mixers .

Pay attention to the following when cleaning the medium-sized concrete mixer:

What To Pay Attention To When Cleaning Medium Concrete Mixers

First, regularly carry out the maintenance and maintenance of the items specified in the maintenance regulations, such as cleaning, lubrication, and refueling.

Second, before starting the medium-sized concrete mixer, check whether the controllers are good. After the shutdown, pour water and stones into the mixer for 10-15 minutes for cleaning, and then clear the water and stones. When the operator must enter the mixing drum for cleaning, in addition to cutting off the power and removing the fuse, the switch box must be locked.

Third, it is forbidden to use a sledgehammer to remove the concrete accumulated in the medium-sized concrete mixer drum, which can only be removed with a chisel.

Fourth, in the severe cold season, after the work is completed, water should be used to clean the rollers of the medium-sized concrete mixer and drain the water in the pumps, water tanks, and water pipes to prevent the water pumps, water tanks, and water pipes from freezing.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message