In the actual production and operation of medium concrete mixer enterprises, due to many factors, such as declining market demand, sluggish sales of the enterprise, and excessive purchase of mixing station equipment, etc., the entire medium concrete mixer will be left unused. Where is the concrete mixing plant?
1. The batching silo of the concrete mixing station needs to be picked up and kept dry and regular inside.
2. Materials in the material storage system are used to classify and pick up special materials. In winter, pay attention to antifreeze methods.
3. The conveyor and dust collector of the medium concrete mixer need to pick up, inspect and protect the equipment first, and place it in a dry place.
4. Placed in the open air needs to prevent corrosion from rain and snow.
5. The twin-shaft forced mixer of the medium concrete mixer needs to be picked up, and the bearings need to be lubricated with the lubricant locally.
In short, when the production line of the medium concrete mixer is not used for a long time, it needs to be resettled accordingly. It should also be inspected when it is not applicable, providing an excellent basis for future operations.