CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-18660761303
  • Email:sales@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Product Wiki  /  How To Operate Tilting Drum Concrete Mixer Safely And Correctly

How To Operate Tilting Drum Concrete Mixer Safely And Correctly

Date:2023-04-23     Label:

Medium-sized concrete mixer

concrete mixing plant

stabilized soil mixing plant

Diesel Concrete Mixer

Tilting Drum Concrete Mixer

Automatic Concrete Mixer

Electric Concrete Mixer

1. After the Tilting Drum Concrete Mixer operation, the stored materials and accumulated water in the machine, water tank, and pipeline should be promptly drained, and the machinery should be cleaned and maintained. The work site should be cleaned, the power should be cut off, and the electric switch box should be locked.

2. The instrument and indicator signals should be accurate and reliable, and the control console of the Tilting Drum Concrete Mixer should be padded with rubber boards or dry wooden boards.

3. The transmission mechanism, working device, brake, etc. should be tightened and reliable to ensure normal operation.

4. The aggregate specifications should match the performance of the Tilting Drum Concrete Mixer, and those exceeding the permitted range should not be used.

5. Empty the vehicle, check the rotation direction of the mixing drum or mixing blades, and confirm the operation, braking, and normal operation of each working device before starting the operation.

6. When feeding, it is strictly prohibited to put your head or hands between the hopper and the frame. During operation, it is not allowed to use hands or tools or other objects to reach into the mixing drum for material discharge.

7. When the hopper is raised, it is strictly prohibited to work or walk under it. The bottom of the material pit should be equipped with a cushion for the hopper. When cleaning the material pit, the hopper must be securely fastened with a chain.

8. Adding materials to the mixing drum should be carried out during operation; Adding new materials must first discharge all the existing concrete from the mixer before proceeding. Do not stop midway or start the mixer at full load, except for those who reverse the discharge.

9. During the Tilting Drum Concrete Mixer operation, if a malfunction occurs and the mixer cannot continue to operate, the power should be immediately cut off and the concrete inside the mixing drum should be cleaned.

10. After the Tilting Drum Concrete Mixer operation, the mixer should be thoroughly cleaned. If the operator needs to enter the cylinder for cleaning, the power must be cut off and a dedicated person must be assigned to supervise outside. Alternatively, the fuse should be removed and the electric switch box locked before entering.

11. After the Tilting Drum Concrete Mixer operation, the hopper should be lowered to the hopper pit, and if it needs to be raised, it should be securely fastened with a chain.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:sales@chinacoalintl.com

Fix: +86-537-2350961

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message