CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-15376502861
  • Email:inquiry@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Industry Info  /  Safety Technology Of Tilting Drum Concrete Mixer

Safety Technology Of Tilting Drum Concrete Mixer

Date:2024-04-09     Label:

Tilting Drum Concrete Mixer

Automatic Concrete Mixer

Electric Concrete Mixer

Safety Technology Of Tilting Drum Concrete Mixer


(1) Tilting Drum Concrete Mixer installation must be smooth and firm, tires must be overhead or unloaded for separate storage, and must be built to prevent rain, smash or heat preservation of the work shed. The operation place is kept neat and clean, and a Tilting Drum Concrete Mixer tank should be dug outside the shed to exclude the wastewater of cleaning machinery.

(2) Tilting Drum Concrete Mixer power wiring must be correct, there must be reliable protection of zero (or protection of grounding) and leakage protection switch, wiring and insulation must meet the specified requirements.

(3) The operating driver of Electric Concrete Mixer must be trained and qualified by the test, obtain an operating license, non-driver operation is strictly prohibited.

(5) At the beginning of each job, each part should be carefully examined for any abnormalities. Before starting the machine, it should check whether the clutch, brake and each guard are sensitive and reliable, whether the wire rope is broken, whether the track and pulley are good, whether the machine is balanced, and whether there are any obstacles around, and confirm that there is no problem before closing the gate to try the machine. To 2 ~ 3min test run, drum rotation balance, no jumping, no deflection, normal operation, no abnormal sound, and then formal production operations.

(6) Maintenance Electric Concrete Mixer, you must cut off the power supply, such as the need to enter the drum within the maintenance, must be in the electric gate box hanging on the "someone working, prohibit the closing of the gate" sign, and set up special guards, to ensure that we can avoid the occurrence of accidents accidentally send power.

(7) After stopping Electric Concrete Mixer, should be timely inside and outside the tube brushing clean, to prevent concrete bonding, after the end of the work, the hopper of Electric Concrete Mixer will be lifted to the top position, with a safety hook to hang firmly. Pull down the electric gate and lock the electric gate box before leaving the site.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message