Why Is The Concrete Mixer Getting Heavier?

Date:2018-11-20     Label:

concrete mixer

concrete mixing plant

stabilized soil mixing station

When using a concrete mixer, how does the vehicle become heavier and heavier? On the same uphill road, the current irrigation began to leak, and it was found that after pounding, it was actually heavier than in the new car. Concrete mixer truck is a kind of vehicle with special media. If it is not cleaned in the process of using it on weekdays, it will be easy to see the condition of tanker. Then should the concrete mixer truck be aware of those situations during its use?

1. After each unloading of the concrete mixer truck, the tanker's own water gun is used to align the feed inlet, the filling port, the blades, the tank body and other tails thoroughly for flushing, so that the concrete can be prevented After solidification will be more and more, until finally difficult to clean.

2. After the concrete mixer truck finishes the transportation work on each day, more than one cubic meter of cleansing is poured into the tank body to rapidly rotate the tank body for cleaning. If it is possible under conditions, it can also be added to the stone in the tank. The cleaning effect will be better.

3. When returning to the mixing station after each unloading, it is necessary to check whether the amount of water in the storage tank is still a full tank.

4. Because the material used for each shipment is not the same, the quality of the concrete may change every time. When loading the material and leaving the site, it is necessary to check the ease and slump of the concrete in the lower tank to prevent the precipitation of the concrete in advance and the premature condensation.

5. Under normal circumstances, the transportation distance of concrete will not exceed 20 kilometers. When the vehicle is out of service, it is necessary to pre-determine the route of traffic and avoid running on the road for a long time.

6, if there are some irresistible factors or considered factors in the process of transportation, resulting in a long time can not be unloading conditions, should be observed at any time in the concrete tank, if there is Concrete condensate should be unloaded immediately, so as to prevent concrete mixer truck tank body from appearing to be scrapped.

Usually, when using a concrete mixer truck , it is necessary to be more meticulous. After loading and unloading materials every day, it is necessary to do flushing work. This can reduce the occurrence of stained cans inside the concrete mixer tank. If you don't clear it for a long time, the car body will appear more and more heavy. In fact, there is no difficulty in the maintenance and use of concrete mixer trucks, mainly because the driver has a more careful and diligent attitude.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message