Concrete Mixer need to be maintained and maintained. Some large-scale mechanical engineering equipments are maintained in different seasons. Maintenance in summer is different from that in winter. How to maintain the concrete mixing machinein winter and how to operate safely and normally in the cold season?
Because of the season. After the operation of the concrete mixing machine, after the day's work , the operators need to remove the ash deposited inside and outside the mixing tank wall, the discharging outlet, the mixing shaft and the upper residue on the discharging door of the equipment. They can use water to flush the equipment's premises. If necessary, they can put in a small amount of stone and water to mix for ten minutes. Then let it out. Clean the truck, additive box and its supply system with water. Forced mixers are what you need to do every day after you run and play. After the operation of the equipment is finished in winter, it is necessary to drain the water and residues in the water pump, additive pump, water tank and additive box. In this way, the damaged pump and its pipeline should be set up in the cold season, and the additive pump of the water pump should be started to run for about one minute.
If theconcrete mixer is not used in winter, each instrument and construction equipment must be turned on twice a week, and each time it takes half an hour to turn on. This prevents frostbite caused by long-term non-use of concrete mixier in winter, or failure to start.