The investment of concrete mixing station has been known for a long time. What must be known about the investment of soil mixing station? I will explain to you throughout the process. The material weighing system, material storage system, material conveying system, bidding host, and control system form the five major systems of the concrete mixing station. Among them, the control system of the concrete mixing station is equivalent to the human brain, which controls and controls all behavioral activities.
If there is a problem with the control system, the entire concrete mixing plant will not be able to work. It is a manufacturer specializing in concrete mixing plant production. Professional technicians have some repair methods for control system failures. Xiaobian will introduce them in detail.
Symptom: There is an aggregate scale with a cantilever beam sensor, the rated weight is 5 tons, and the linearity is less than 1 ton, but the linearity is better than 1 ton. , Voltage method and pressure angle method are all good. Repair method: After careful observation at the scene, it was found that there was material accumulating under the strain zone of one of the sensors. After removal, all were normal.
Cause of failure: For large-range sensors, deformation does not occur under the condition of small weight, but when the weight is increased, the sensor will undergo slight deformation. At this time, if an object affects the deformation, the sensor output will not be linear. Solution: When installing a beam sensor, you must pay attention to the fact that one end of the fixed sensor cannot exceed the strain zone. The strain position of the beam sensor is generally in the middle and the shape is narrower than the two ends. It must not affect the strain position during installation.
The investment and production of the concrete mixing station needs sufficient space, that is to say, a special production space is needed as a site, then a factory needs to be built. This is also in the investment cost of the concrete mixing station in the early stage, but it will save money for renting . Worker training and production are links that cannot be ignored, and each worker is trained in pre-job operations, so many troublesome matters can be effectively saved during the operation.