CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-15376502861
  • Email:inquiry@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Industry Info  /  How To Maintain The Concrete Mixing Station During The Break-In Period

How To Maintain The Concrete Mixing Station During The Break-In Period

Date:2020-02-08     Label:

Concrete Mixing Station

concrete mixer

concrete mixing plant

New equipment must be bought through a running-in period, as is the concrete mixing station. As long as you have a comprehensive understanding of the structure and function of the concrete mixing station in the early stage, you can ensure that it will perform very well in future production. Therefore, the progress of the running-in period of the concrete mixing station is still very important. When operating the machine, the operator must first read the operating instructions and perform maintenance in accordance with the relevant instructions.

Each type of concrete mixing station has additional output, so the production type must be operated according to the instructions given by the manufacturer. It cannot be changed at will, and it cannot be overloaded. It is often observed that if an abnormality occurs, it should be parked in time to eliminate it. Before the cause is found and the fault is not eliminated, the operation should be completed.

How To Maintain The Concrete Mixing Station During The Break-In Period

Also pay attention to the level of smooth oil, hydraulic oil, coolant, brake fluid and fuel oil (water), and pay attention to the tightness of the machine. Excessive creation of oil and water in the review should be analyzed. The smoothness of each smooth point should be strengthened. It is recommended that during the running-in period, each shift should be filled with smooth grease (except for special requests).

The operator should insist on cleaning each equipment of the concrete mixing station, and adjust and tighten loose parts in time to prevent the wear and tear of the parts due to the loosening or the loss of the parts. After the break-in period is over, the machine should be maintained, maintained and adjusted, and pay attention to the oil exchange.

The concrete mixing station can go longer after running in, so dear users and friends, we must lay a solid foundation in the early stage to ensure smoother production.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message