Position:Home  /  Product Wiki  /  Attentions When Installing Concrete Mixing Plant

Attentions When Installing Concrete Mixing Plant

Date:2020-02-16     Label:

Concrete Mixing Plant

concrete mixing station

concrete mixer

Attentions when installing concrete mixing plant:

Install the mixing host in the concrete mixing plant, properly raise the lower surface of the concrete mixer chassis, connect the legs to the host with hinges, install the cement scale, water scale, and additive scale, and then lift, measure and adjust the host chassis. , Make it in a horizontal state, after the centerline of each leg and the centerline of the foundation coincide, you can cast the anchor bolt in the reserved pit or weld the base and the reserved embedded parts.

Attentions When Installing Concrete Mixing Plant

concrete mixing plant Install the screw conveyor. Before lifting, check the lubrication points for filling with oil and grease. Run the empty car to test the problems and solve the problems in time. Install the batching machine in place according to the requirements of the basic diagram. Place the small batching machine in The solid foundation can be placed on the plane of the pier. The large batching machine requires pouring anchor bolts. After the installation of each mechanical part, check that all the lubrication points of various equipment are filled with lubricating oil, and then you can connect the wires according to the requirements of the instructions and electrical schematic diagrams. The box is subjected to an empty car running test.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message