CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-15376502861
  • Email:inquiry@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Product Wiki  /  What Should Be Paid Attention To In The Equipment Of High-efficiency Vibration Stabilized Soil Mixing Station?

What Should Be Paid Attention To In The Equipment Of High-efficiency Vibration Stabilized Soil Mixing Station?

Date:2020-07-25     Label:

stabilized soil mixing station

Medium concrete mixer

concrete mixing plant

The production efficiency of the vibration stabilized soil mixing station determines the speed of the entire project. The quality of the vibration mixing is also related to the quality of the project. In order to ensure the mixing quality and efficiency, you can use an excavator to turn it over to measure the moisture content of the raw materials. Since the water content of black ash and white ash is determined by many uncertain factors, especially white ash, the digestion quality, its own quality, and whether it is sieved all affect the utilization rate of white ash.

What Should Be Paid Attention To In The Equipment Of High-efficiency Vibration Stabilized Soil Mixing Station?

1. To ensure the most suitable construction water content of white ash, stabilized soil mixing station is necessary to grasp the appropriate unstacking time. After unpacking, if it is too wet, you can use an excavator to turn it upside down several times until the proper moisture content is reached, which not only guarantees the construction efficiency, but also guarantees the ash dosage. The location of the stabilized soil mixing station is also very important. In particular, whether the transportation in the factory area is smooth is also related to production efficiency. Because in production, not only the efficiency of the loading machine should be considered, but also the transportation vehicles should not stop blocking, and the feeding vehicles should not affect the construction on site.

2. The loader should load the material when the material barrels on the silo are screened by the material barrels, which is convenient for the material barrels to work; but it cannot be loaded too late, otherwise the material will be cut off. Therefore, the improvement of the efficiency of the stabilized soil mixing station is comprehensively affected by many factors, which require close cooperation between man and machine, external factors, and internal factors.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message