When debugging the medium concrete mixer control system, first reset the pressing button, turn on the power male switch in the electrical cabinet, and then turn on the branch circuit breakers, control circuit power switches, and control room power switches in sequence to observe whether there are any abnormalities in the electrical system. , Check immediately if available;
Turn on the buttons of each motor and test whether the steering of the motor is accurate. If medium concrete mixer is not accurate, you should adjust it immediately; start the air compressor of the medium concrete mixer, and after the air pressure reaches the requirement, start the air control doors in sequence according to the button markings to check the action. It is not sensitive; zero adjustment and sensitivity adjustment of the microcomputer; check whether the switch of the air compressor is normal, whether the pressure gauge is accurate, and adjust the pressure of the safety valve to a standard range;
Perform a trial operation on the medium concrete mixer to see if there are abnormal noises and whether each component can work normally; when debugging the belt conveyor, it is necessary to work, and check whether each roller is sensitive during the operation, and carefully observe the belt. There should be no sway, deviation, edge grinding, skidding, deformation, etc.;
When debugging the medium concrete mixer, you must press the batching button more to see if it is sensitive and the accuracy of the equipment, and then refer to the batching in the debugging. After commissioning, the concrete mixer is ready for production!