CONTACT US
  • Tel/Wechat/Whatsapp:
    +86-15376502861
  • Email:inquiry@chinacoalintl.com
  • Fix:+86-537-2350961
  • Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Product Wiki  /  Tips On How To Use Stabilized Soil Mixing Station Correctly

Tips On How To Use Stabilized Soil Mixing Station Correctly

Date:2021-05-24     Label:

Stabilized Soil Mixing Station

Stable Soil Mixing Plant

Concrete Mixer

Generally speaking, the safety of the use of stabilized soil mixing station is very important to us. For this problem, how should we prevent it, and how to deal with this series of problems, we should be specific How to do it, let's take a look at it in detail below.

stabilized soil mixing station is a large-scale mechanical equipment commonly used in modern road construction. In order to better ensure the safety of the machine in use, what should be paid attention to when using a stabilized soil mixing station:

1. Prevent people from approaching within 1 meter of the stable soil mixing station. When the stable soil mixing station conveyor belt is working, a certain safety interval (60cm) must be adhered to. In order to prevent splashing and falling of rubble, it is necessary to wear safety when entering the work site Cap; in order to better cooperate with the staff in commanding the vehicles and ensuring the safety of the staff.

2. When the stabilized soil mixing station is working, let the machine run idling for a while (the rotor will slowly drop to the mixing depth after raising it off the ground). When the machine is working, stop using the reverse gear to continue mixing the remaining materials of yesterday and stop turning on the spot. , To stop sharp turns. When the bottom layer encounters obstacles, the rotor should be raised immediately and the obstacles should be dealt with; before the machine works, all parts of the machine should be carefully checked, whether the electrical response is active, whether the bolts are loose, whether there are condensed materials on the mixer and conveyor belt; The staff in the operating room should not leave their duties without authorization, and other personnel should not enter. Electrical components should be equipped with moisture-proof and defensive equipment. The electrical components should be maintained and maintained by professional electricians. After the work is completed, the remaining materials should be cleaned up and the doors and windows of the operating room should be locked. Turn off the power.

I started with each detail to observe the safety and stability of a stabilized soil mixing station, as well as some precautions to prevent safety problems, which is very important for us.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message