Effective control measures for metering error of stabilized soil mixing plant
(1) Reasonable control of concrete batching
During concrete construction management, mixing and metering must be carried out in combination with batching, and the batching and transportation work shall be done well to avoid various metering problems during construction. During the construction period, various advanced technologies and equipment should be used to minimize the loss of ingredients at the equipment interface. During the measurement work, environmental protection should be paid high attention to, and the measurement error should be minimized. The accurate weight of ingredients can be calculated by using the measurement average countermeasure.
(2) Strengthen the management of concrete production enterprises
During the management of concrete enterprises, we should pay more attention to management. During the procurement of raw materials for concrete enterprises, various contents and materials need to be reported in time. Only after passing the inspection of relevant departments can the raw materials be effectively used during the construction period. We must purchase from within the formal enterprise to eliminate the problem of substandard procurement quality. Then in the production process of concrete enterprises, inspection work must be done well in advance. After the operation, a large number of production work needs to be carried out to avoid waste of raw materials. We should also improve the maintenance of all equipment, regularly replace and monitor the original equipment, ensure that the overall construction process is more smooth, and prevent the occurrence of construction problems and failures caused by mechanical accidents during construction.
(3) Control algorithm reduces batching error
During the batching work in the concrete mixing plant and the period when the material delivery is about to end, the calculation has a certain relationship with the delivery rate and time. The feeding work should be ended in advance to ensure that the added materials will not exceed the quantity under the standard. The error calculation and analysis of the insufficient materials should be carried out to ensure that the results are accurate, and the next feeding time should be used to make reasonable compensation, Generally, it is necessary to determine the drop value by using the empirical method and the average value method of multiple experiments.