Position:Home  /  Industry Info  /  How To Maintain Various Components Of Concrete Mixing Plant Equipment? Here You Are

How To Maintain Various Components Of Concrete Mixing Plant Equipment? Here You Are

Date:2019-03-27     Label:

Medium concrete mixer concrete mixing plant stabilized soil mixing station

After purchasing the equipment of concrete mixing station, do you want to use it for a longer time, so how can we use it for a longer time? Concrete mixing station is like a car, which needs maintenance. If it is guaranteed well, it can be used for a long time. So, how do we maintain it? Today,Mixing Station equipment to introduce you to various parts maintenance instructions.

1. Maintenance of concrete mixing plant

Concrete mixing plant can be said to be the main parts of concrete mixing station, without him, his concrete mixing station can not work, so maintaining the concrete mixer is also a necessary thing for us. For the maintenance personnel of our concrete mixing station, we need to do the following.

A. When the reducer of stabilized soil mixing station is put into use for 50 hours for the first time, the lubricant should be replaced, and then the reducer lubricant should be replaced every 1000 hours or at least half a year. The oil pump needs to check whether the grease really reaches the shaft head every day.
B. After one cycle of medium concrete mixer operation, it is necessary to remove the mixture residue, clean the mixing shaft, mixing arm and mixing knife. When manual cleaning is carried out, it is forbidden to use hammer to remove the mixture residue, because violent impact will break the mixing knife.
C. When the clearance of each component of concrete mixer is greater than 8 mm, the clearance should be adjusted to 3 mm by adjusting blades or replacing vulnerable parts.

2. Maintenance of concrete batching machine

Every day we have to inspect the concrete batching machine and find out the debris on the screen in time. The clearance should be adjusted in time after it is found that the clearance is worn out during patrol inspection. After adjusting to the limit position, if adjustment is needed, the gap can be adjusted by welding repair method.

3. Maintenance of screw conveyor

Operators of the equipment should check whether the belt is running in the right direction every day and find out that the deviation should be adjusted in time to avoid the damage of the belt; check the use effect of the belt sweeper, adjust or replace the sweeper in time; check whether the sticky material on the idlers and drums should be cleaned up in time; whether the surface of the belt is damaged, if there are signs of damage, it should be repaired in time to avoid the spread of damage.

4. Maintenance of cement bin

Operators of concrete mixing stations should inspect the cement bin every hour. Once ash comes out of the top pressure relief valve, the safety valve and surrounding powder should be cleaned in time to prevent powder from caking in rain water and make the relief valve invalid. Carry out a comprehensive cleaning inspection of the safety valve every six months.

5. Maintenance of Control System

Mixing station control system, just like human brain, is one of the most important equipment in the mixing station. We need to check the control system every day and deal with problems immediately. In addition, monthly inspections of the control system should be conducted to test whether the relevant electrical appliances are normal.

The above five points are how to maintain the equipment of concrete mixing station introduced by Xiaobian. Only by doing a good job in the maintenance of the equipment of concrete mixing station can its service life be improved and the frequency of machine failure be reduced. Users must pay attention to them.

Please send us a message

Contact Us

Tel/Wechat/Whatsapp:+86-18660761375

Email:inquiry@chinacoalintl.com

Fix: +86-15376502861

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China

+

+

Please leave a message
skype
message