Shandong China Coal Concrete Mixer Co., Ltd.

  • Home
  • About 
    • Company Profile
    • Company License
  • Product
  • news 
    • Company News
    • Industry Info
    • Product Wiki
  • contact
Notice: Shandong China Coal Concrete Mixer Co., Ltd. is a heavy industry enterprise specializing in the production of large and medium-sized concrete mixers, concrete mixing station, stabilized soil mixing stations, etc.
HOT PRODUCT
  • Motar Mixer Portable Diesel Concrete Mixer Machine

  • JZC350-DH Reversing Drum Concrete Mixer

  • TDCM500-DHT Tilting Drum Concrete Mixer

  • TDCM350-DHT Tilting Drum Concrete Mixer

  • CM500-4C Tilting Drum Concrete Mixer

  • CM500-2C Tilting Drum Concrete Mixer

more +
  HOT NEWS
  • China Coal Group Participate In The Jining Labor Dispute Mediation Association General Assembly

  • Leaders Of Anbiao National Mining Product Safety Labeling Center Visit China Coal Group For Exchange

  • Jining New Generation Information Technology Industry Special Class Visited China Coal Group For Investigation

  • China Coal Group And Shandong Maita Law Firm Held A Signing Ceremony For Legal Services

  • China Coal Group Provides Spring Festival Benefits To All Employees

  • China Coal Group Approved The Second Batch Of Technological Innovation Project Plan Of Shandong Province In 2022

more +
Position:Home >> Industry Info>>Maintenance Of Medium Concrete Mixer After Use

Maintenance Of Medium Concrete Mixer After Use

Date: 2020-11-02      view:14       Lable: Medium Concrete Mixer Maintenance Concrete Mixer

The medium concrete mixer consists of a mixing drum, a supporting wheel and a transmission system. In order to make it function better, we should pay attention to maintenance of medium concrete mixer

The medium concrete mixer consists of a mixing drum, a supporting wheel and a transmission system. In order to make it function better, we should pay attention to maintenance of medium concrete mixer after use.


1. Before stopping the medium concrete mixer, put in a certain amount of stones and water, stir for 3-5 minutes, and then release, so that the accumulation in the cylinder can be repeated several times. After each shift, the deposits in the cylinder must be cleaned.

2. Clean the dust and the concrete adhered to the whole machine.

3. Place the hopper on the transportation position and hang the hook.

4. Cut off the power supply and lock the electrical box.

5. In the freezing season, the remaining water should be discharged from various places in the slurry water supply system.

6. Add necessary lubricating oil to each lubrication point as appropriate.

7. Refuel at the clutch ring, top bar, and grease nipple once per shift.

Maintenance Of Medium Concrete Mixer After Use

Previous:Matters Needing Attention In The Work Of Concrete Mixing Plant
Next:Brief Introduction Of Medium Concrete Mixer
Contact

Shandong China Coal Concrete Mixer Co., Ltd.

Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Tel: +86-537-2486099 Fix: +86-537-2350961 Email: sales@chinacoalintl.com
Copyright:© Shandong China Coal Concrete Mixer Co., Ltd. © 2019
+86-537-2350961
sales@chinacoalintl.com
skype sail Online Email:sales@chinacoalintl.com
menu
Home Products Top

+

+

Please leave a message